Laserfiche WebLink
<br /> <br />----------------- <br /> <br />counteract the potential exposure and for the included in contract specifications. <br />prevention of contaminated groundwater release <br />from the construction site. The human exposure to Radiological monitoring of excavated soil and <br />contaminated soils and the potential for release of rock performed on daily basis. <br />contaminated groundwater from the site will be <br />mitigated by the following measures: All site workers provided with training in <br /> radiological hazards and safety, <br />. review remediation reports and current <br /> monitoring data to understand existing Reports were reviewed. <br /> subsurface conditions in respect to radioactive <br /> material <br />. obtain preconstruction soil and water samples The soil and water was sampled, <br /> at site for lab testing <br />. develop site safety and health management A site safety and health management plan and <br /> plan with radiation protection for workers and radiation control plan was developed and is being <br /> public used for construction at the site, <br />. develop construction plan to deal with A construction plan was developed and is being <br /> hazardous conditions of excavated soil and used at the site. <br /> groundwater <br />. utilize analytical data to design treatment A treatment plan was developed; however, <br /> system for contaminated water monitoring indicated that no treatment of <br /> contaminated water was necessary during 2003. <br />. receive Colorado Discharge Permit (CDP) for <br /> treated water A discharge permit was obtained from EP A. <br />. pumping plant design and construction Pumping plant design and management plans <br /> management plan are to be approved by were approved by Department of Energy and <br /> Environmental Protection Agencv (EPA) and Colorado Department of Public Health and <br /> <br />22 <br /> <br />o <br />C;;) <br />C;;) <br />~ <br />c..> <br />...... <br />