Laserfiche WebLink
<br />------------------- <br /> <br /> . management of future recreational <br /> development <br /> . operation & maintenance of facilities <br /> . public interpretation and public <br /> involvement <br />9-2 Reclamation will ensure that areas to be disturbed 2000 FSEIS 5-17 All construction areas were surveyed prior to <br /> are field surveyed prior to construction disturbance disturbance and if cultural resources were found, <br /> and will ensure that construction monitoring is appropriate action was taken. Monitoring is <br /> conducted where deemed appropriate. being conducted as construction proceeds. <br />9-3 Ensure compliance with Native American Graves 2000 FSEIS 5-17 NAGPRA Plan has been developed and <br /> Protection and Repatriation Act (NAGPRA) and implemented in consultation with Tribes. <br /> Executive Order 13007; development of project Consulting Tribes have been sent six (6) <br /> specific NAGPRA plan. Avoidance and in-place notifications of NAGPRA item discovery. <br /> preservation of graves and sacred sites; for Preliminary Cultural Affiliation Study to <br /> mitigation, Reclamation will consult with tribes determine custody of NAGPRA items has been <br /> and develop methods to be followed to deal with completed. Consultation with potentially <br /> human remains and artifacts. affiliated Tribes is ongoing. <br />9-4 Paleontological survey of all properties to be 2000 FSEIS 5-17 Reclamation continues to perform paleontological <br /> disturbed prior to construction; construction surveys before and during construction activities. <br /> monitoring as deemed appropriate. Area underlain <br /> by Animas, Kirtland, Fruitland, and Picture Cliff <br /> sandstonelfoundation will be surveyed prior to <br /> construction; Areas underlain by Lewis Shale will <br /> be spot checked following construction, prior to <br /> filling; immediate notification during construction <br /> if fossils are uncovered. <br />9-5 Periodic shoreline monitoring for paleontologic 2000 FSEIS 5-17 There will be no action on this commitment until <br /> resources as part of facilities operations. the reservoir begins filling. <br />10 - Agricultural Commitments <br />10-1 I Location, design, and construction timing of 2000 FSEIS 5-17 Firming up the alignment of the NNMP occurred <br /> <br />20 <br /> <br />0 <br /><:;) <br />c::.;) <br />00 " <br />c..:> " <br />c.O - <br />