Laserfiche WebLink
<br />------------------- <br /> <br /> for bioaccumulation of trace elements in bald the start of filling of Ridges Basin Reservoir. <br /> eagle food chain in RBR. Develop and <br /> implement an action plan for corrective action <br /> as appropriate. <br /> . Incorporation of bypass flows into ALP Operation procedures will be included in the <br /> operations to promote natural recruitment of standard operation procedures for the DPP. <br /> cottonwoods on the AR. <br /> . Electrical transmissions lines will be designed Temporary power lines to contractor and <br /> to avoid injury to raptors, including the bald Government office facilities located in Ridges <br /> eagle. Basin were constructed using raptor proof <br /> standards. <br />7-2 Wildlife and wetland/riparian areas should provide 2000 FSEIS 5-16 Work continues during 2003 on the restoration of <br /> high quality protected habitat for species such as the wetland/riparian area on the La Plata River. <br /> willow flycatcher and bald eagle. Once the restoration is complete the <br /> wetland/riparian area should provide a high <br /> quality protected habitat for species such as <br /> willow flvcatcher and bald eagle. <br />8 - Geology and Soil Commitments <br />8-1 Reclamation will reduce or eliminate the potential 2000 FSEIS 5-16 Reclamation has designed Ridges Basin Dam to <br /> for earthquake damage to the RBD site through reduce or eliminate the potential for earthquake <br /> specific design specifications. damage to the maximum extent possible by <br /> designing the dam to be completely founded on <br /> bed rock and use of earthquake resistant <br /> embankment materials. <br />8-2 Reclamation will develop a controlled program for 2000 FSEIS 5-16 Filling of the reservoir is a part of the design for <br /> filling RBR to reduce potential for induced seismic the dam and reservoir and will depend upon <br /> impacts. factors such as hydrology of the Animas River at <br /> the start of filling of the reservoir. <br />8-3 Reclamation will develop and implement a 2000 FSEIS 5-16 A plan will be put in place at the start of filling of <br /> <br />16 <br /> <br />o <br /><:;) <br />c.:J <br />00 <br />~ <br /><:.Jl <br />