Laserfiche WebLink
<br />------------------- <br /> <br /> facilities operation program that includes the reservoir to implement this commitment. <br /> monitoring the reservoir shoreline and slope for <br /> landslide and slumping and provide for public <br /> notification and control public access in areas <br /> where high landslide and slumping potential exists. <br />8-4 Reclamation will develop an engineered process 2000 FSEIS 5-16 No construction activity in potential gas release <br /> plan to limit, control and manage dam site methane areas was conducted during 2003. See 7-5 for <br /> gas releases during construction. Also, more information. <br /> Reclamation will monitor the area for gas releases <br /> during operation. <br />8-5 Reclamation will investigate potential for gas 2000 FSEIS 5-16 The final design for Ridges Basin Dam has <br /> release due to man-made intrusions in RB and dam avoided possible intrusion into any existing coal <br /> site involving abandoned wells and coal mines. beds/mines. Plugging of gas wells in the <br /> Reclamation will implement prescribed mitigation reservoir basin will be instituted in the future. <br /> such as plugging abandoned mines and wells. <br />8-6 Construction contractors will utilize erosion 2000 FSEIS 5-16 Erosion control procedures and BMP have been <br /> control guidelines and BMP to control soil erosion. included in the specification of all awarded <br /> Mitigation to reduce erosion for from construction contracts. All of the mitigation procedures are <br /> areas of RBR, RBD, DPP, and NNMP and end-use being used with the exception of conducting soil <br /> conveyance structures will include: disturbing activities only through May 1 - <br /> October 15. Because of the project schedule, soil <br /> . using water trucks to minimize wind erosion disturbing activities will occur all year where <br /> and dust practicable. <br /> . conduct soil disturbing activities only May 1- <br /> October 15 <br /> . avoid disturbing steep slopes when feasible <br /> . construct fill slopes to a 2/1 ratio or flatter <br /> . construct V -ditches above cut or fill slopes to <br /> <br />17 <br /> <br />c:::> <br />c::;, <br />o <br />00 <br />c..:> <br />en <br />