Laserfiche WebLink
<br />------------------- <br /> <br />. In order to insure accuracy of the Model, The procedure for this review and the review <br /> Reclamation will take actions necessary to were completed and concurred with by the <br /> have an independent review of the model Service (September 2000) <br /> conducted with in one year of the biological <br /> opinion, Reclamation will complete a review <br /> of the Riverware model and then coordinate <br /> with the Service to recei ve concurrence on the <br /> results of Reclamation's findings. <br />. The October 1991 Memorandum of Memorandum remains in effect. <br /> Understanding and Supplemental Agreement to <br /> protect the releases from Navajo Reservoir for <br /> endangered fish will remain in effect. <br />. DPP will be operated in a manner that insures Operation procedures will be included in the <br /> that its operations do not interfere with meeting standard operation procedures for the DPP. <br /> the target flows recommended for the SJR. <br /> Pumping at the DPP will honor the bypass <br /> flows: October-November 160 cfs, December- <br /> March 125 cfs, April-September 225 cfs. <br />. Reclamation will implement all actions See response to 5-6. <br /> necessary to prevent escapement of non-native <br /> fish from RBR in any water leaving the <br /> reservoir. Reclamation will monitor the water <br /> leaving the reservoir. If escapement is <br /> occurring, Reclamation will development a <br /> plan to stop escapement and have the plan <br /> concurred to by the Service. <br />. Develop and implement monitoring program Activity on this commitment will not begin until <br /> <br />15 <br /> <br />o <br />Q <br />c;;l <br />00 <br /><:;l <br />ol'- <br />