My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00304
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:48:53 AM
Creation date
10/9/2006 2:04:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.I
Description
Colorado River Water Projects - Animas La Plata - Environmental Studies
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
4/15/2004
Author
DOI-BOR
Title
Animas La Plata Project - Environmental Commitment and Monitoring Plan
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />------------------- <br /> <br />. In order to insure accuracy of the Model, The procedure for this review and the review <br /> Reclamation will take actions necessary to were completed and concurred with by the <br /> have an independent review of the model Service (September 2000) <br /> conducted with in one year of the biological <br /> opinion, Reclamation will complete a review <br /> of the Riverware model and then coordinate <br /> with the Service to recei ve concurrence on the <br /> results of Reclamation's findings. <br />. The October 1991 Memorandum of Memorandum remains in effect. <br /> Understanding and Supplemental Agreement to <br /> protect the releases from Navajo Reservoir for <br /> endangered fish will remain in effect. <br />. DPP will be operated in a manner that insures Operation procedures will be included in the <br /> that its operations do not interfere with meeting standard operation procedures for the DPP. <br /> the target flows recommended for the SJR. <br /> Pumping at the DPP will honor the bypass <br /> flows: October-November 160 cfs, December- <br /> March 125 cfs, April-September 225 cfs. <br />. Reclamation will implement all actions See response to 5-6. <br /> necessary to prevent escapement of non-native <br /> fish from RBR in any water leaving the <br /> reservoir. Reclamation will monitor the water <br /> leaving the reservoir. If escapement is <br /> occurring, Reclamation will development a <br /> plan to stop escapement and have the plan <br /> concurred to by the Service. <br />. Develop and implement monitoring program Activity on this commitment will not begin until <br /> <br />15 <br /> <br />o <br />Q <br />c;;l <br />00 <br /><:;l <br />ol'- <br />
The URL can be used to link to this page
Your browser does not support the video tag.