My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00304
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:48:53 AM
Creation date
10/9/2006 2:04:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.I
Description
Colorado River Water Projects - Animas La Plata - Environmental Studies
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
4/15/2004
Author
DOI-BOR
Title
Animas La Plata Project - Environmental Commitment and Monitoring Plan
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />------------------- <br /> <br /> rates will be staged: when ri ver flow are 500 cfs or the pumping plant. <br /> greater--increase in pumping not to exceed 50 <br /> cfs/hr and decrease in pumping not to exceed 100 <br /> cfs/hr. When river flows are below 500 cfs, <br /> increased pumping not to exceed 25cfs/hr and <br /> decrease in pumping not to exceed 50 cfs/hr. <br /> Seasonal bypass flows of 225 cfs (April- Commitments will be honored once the pumping <br /> September), 160 cfs (October-November) and 125 plant goes into operation. <br /> cfs (December-March will be honored. <br />6-4 Monitoring of the AR for native fish and trout will 2000 FSEIS 5-14 The 2002 monitoring report (2002 Fish Studies <br /> begin prior to project operation and continue for at & on the Animas and La Plata Rivers) was <br /> least 4 year after project pumping begins. The 5-15 completed in June 2003. Monitoring of the AR <br /> studies are to be designed to understand native continued during 2003. A draft of the 2003 <br /> fishery, native sucker recruitment, and monitor monitoring report is scheduled to be completed in <br /> trout population. If Project operations have a January 2004, <br /> significant adverse effect, every reasonable effort <br /> will be made to reduce or eliminate impacts. In <br /> 2000, investigations will be initiated to determine <br /> whether or not fish barriers exist, whether small <br /> fish Iyoung of the year are lost through <br /> entrainment in canals, and whether effects to trout <br /> fishery may occurs. A recommendation for <br /> mitigation on possible effects to native fish will be <br /> made by 2005. Once the recommendation is <br /> approved by Service, CDOW, New Mexico <br /> Division of Game & Fish (NMG&F), and possibly <br /> the SUIT, it implementation will begin <br /> immediately. <br />6-5 Reclamation will review and adopt established 2000 FSEIS 5-15 Facilities have been included in the design of the <br /> guidelines for screening facilities to minimize fish DPP to minimize fish entrainment and <br /> entrainment and impingement at DPP and utilize impingement. Meeting was held on 10/1/2002 <br /> <br /> <br />~ <br />I:> <br /><lO <br />-0 <br /> <br />- <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.