My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00304
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:48:53 AM
Creation date
10/9/2006 2:04:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.I
Description
Colorado River Water Projects - Animas La Plata - Environmental Studies
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
4/15/2004
Author
DOI-BOR
Title
Animas La Plata Project - Environmental Commitment and Monitoring Plan
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />------------------- <br /> <br /> for wetland/riparian vegetation will compensate for <br /> habitat losses; shield and shroud equipment to <br /> minimize noise; signage and restricted access will <br /> be put in place to control access; restrictions will <br /> be put on nighttime construction and lighting. <br />6 . Aauatic Resources <br />6-1 Reclamation will fund a detailed evaluation of 2000 FSEIS 5-14 Work on this commitment will be completed <br /> RBR's expected limnological conditions to during FY 2004-2005. <br /> determine if water pumped to RBR needs to be <br /> delivered at an elevation below the thermocline. <br /> This activity will be completed in coordination <br /> with the Service as part of the design data <br /> collection activities. <br />6-2 Develop and implement a monitoring program for 5-14 No activity on this commitment during 2003 <br /> bioaccumulation of trace elements in fish at RBR. except some clearing of areas within the basin <br /> The monitoring program will be initiated 2 years necessary for the relocation of the gas pipelines <br /> after RBR is filled and will last 4 consecutive and initiation of construction on Ridges Basin <br /> years. As part of construction, vegetation in Dam, <br /> reservoir basin will be largely cleared to reduce the <br /> magnitude of producti vity and reduction potential <br /> (methylated mercury). If significant <br /> bioaccumulation effects are determined, <br /> Reclamation will work with the appropriate local, <br /> state and federal agencies to either minimize the <br /> impact or otherwise offer protection to potentially <br /> impacted fish and wildlife species and to possibly <br /> post human consumption advisories. Trout will be <br /> the only fish stocked in RBR <br />6-3 To minimize downstream stranding of fish due to 2000 FSEIS 5-14 Procedures outlined in this commitment will be <br /> pumping plant operations, changes in pumping included in the standard operating procedures for <br /> <br />11 <br /> <br />c:::> <br />o <br />c <br />00 <br />c..:I <br /><:::> <br />
The URL can be used to link to this page
Your browser does not support the video tag.