Laserfiche WebLink
<br />------------------- <br /> <br /> Best Available Technologies for the facility to with the Service and the CDOW to discuss design <br /> meet those requirements. being used. <br />6-6 Screens or other physical structures will be utilized 2000 FSEIS 5-15 State of the art design has been included in the <br /> to prevent the release of live fish from RBR. To design of the Ridges Basin Dam outlet works to <br /> prevent the release of fish from RBR, the dam prevent release of fish from RBR. Meeting was <br /> outlet structure will be designed to take water from held on 10/1/2003 with the Service and the <br /> deep water zones, hyplolimnetic water. BC and CDOW to discuss design of the outlet works. In <br /> RBR will be monitored to determine any fish a letter from the Service following the meeting, <br /> escapement. the service recommended that a monitoring plan <br /> be put in place once the outlets works goes into <br /> operation to monitor for any type of fish <br /> escapement from the reservoir. The design for <br /> the outlet works includes the use of an energy <br /> dissipating sleeve valve to prevent live fish <br /> escapement. The dam outlet structure has been <br /> designed to take water from the deep water zones. <br />6-7 Reclamation will fund acquisition and stocking of 2000 FSEIS 5-15 Activities during 2003 consisted investigating <br /> wild strains of trout annually in the Animas River sources and availability of trout and discussions <br /> within the boundaries of SUIT. Stocked trout will with the SUIT on the feasibility of construction <br /> be marked and monitored according to age class in of a fish hatchery that could be used by both the <br /> coordination with SUIT, CDOW, NMDGF and the Tribe and Reclamation. <br /> Service. The success will be assessed after four <br /> years. If it is deemed a success the stocking <br /> program will continue. <br />6-8 Reclamation will stock RBR with trout for a 2000 FSEIS 5-15 No activity on this commitment will begin until <br /> recreational fishery. RBR begins filling. <br />6-9 Reclamation will acquire at least two new public 2000 FSEIS 5-15 See 10-2 for details on accomplishments. <br /> access points on the AR for fishing and other <br /> recreation use. See 10-2 for more information. <br />7. Special Status Species Commitments <br />7-1 Reclamation will implement conservation 2000 FSEIS 5-15 I <br /> <br />13 <br /> <br />0' <br />Q.. <br />Q':?" <br />co_~'. <br /><:.:) <br />N <br />