My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00271
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:48:45 AM
Creation date
10/9/2006 2:03:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/31/1997
Title
Boyle IIIa WRP Enhancement-Amendment 1-Phase IIIa Scope of Services-Exhibits A-D-Tasks 1-11.02
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />4, STATE: Document the physical aggregation process in a draft 1-2 page memorandum. RTi will <br />review this memo and provide written comments to the State, This draft memo will also be provided to <br />the Division Engineer for his review and comments. State will resolve comments to memo, <br />5. STATE: Finalize memo. <br /> <br />Deliverables: <br />1. Groupings of aggregated acreage and associated files ofwdid and acreage's within each grouping, <br />Boundaries will be drawn on ArcView project prepared in previous Task.. <br />2. Map of White River Basin with layers from previous Task and aggregation boundaries. <br />3. Report of any WDIDs which exist in more than one aggregated grouping. <br />4. Draft memo of aggregation process and outcomes, Provided to RTi and Division Engineer for <br />comments, <br />5. Final memo. <br /> <br />Task 2.04 <br /> <br />Add aggregated irrigation structures to network <br /> <br />Objective: Incorporate the aggregated groups of irrigation structures defined in Task 2,03 into the <br />Phase III model network. <br /> <br />. <br /> <br />Approach: <br />1. RTIWR: ModifY the ,net file to include the aggregated nodes and structures, Typically the <br />aggregated structure location will be below the base flow node, <br />2. RTIWR: Run makenet to generate a model network (including line diagram) with aggregated <br />structures. Makenet should include the name of the aggregated structure in thc .rin file. <br /> <br />Deliverables: <br />1. A model network (net and ,rin) file which has incorporated aggregated irrigation structures (id and <br />name), <br />2. An 11 by 17 inch line diagram of the new model network <br /> <br />Task 2.05 <br /> <br />Define Water Right Classes <br /> <br />Objective: Define approximately 10 water administration classes to be used to model the aggregated <br />irrigation and reservoir groups in the White River Basin. <br /> <br />. <br /> <br />Approach: <br />1. STATE: Use watright to generate listing of net absolute water rights in a basin, use StateMod to <br />generate list of structures modeled in Phase II, and use ArcView to generate list of structures tied to <br />irrigated lands. Import these files to a spreadsheet and generate the a plot of the cumulative net decreed <br />amounts vs. administration number for: <br />. all absolute water rights <br />. absolute water rights explicitly modeled in Phase II model <br />. absolute water rights tied to a polygon to be included in the aggregation. <br /> <br />Phase Illa Scope of Services <br /> <br />1175 A-9 <br /> <br />Jan 31,1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.