Laserfiche WebLink
<br />. <br /> <br />One plot will be generated with all three data series on it, showing net cumulative decreed <br />amounts vs. administration number. <br />2. STATE: Divide the water right administration number domain into approximately 10 classes, <br />considering the following criteria: <br />'priority of key calling rights <br />'common sources of protection <br />'generally equal distribution of the total decreed amount among classes <br />The Division office should be solicited for input regarding the first two criteria; the plots <br />developed in Task 2,05,1 will support decisions based on the third criterion. RTi will provide input <br />into this process, <br />3. STATE: Prepare a Draft Task Memorandum describing the process and results of the determination <br />of the water right classes. The memo is expected to be approximately 3 to 5 pages, including the <br />cumulative water right plot. A table should be included tabulating the structures represented by each <br />aggregation, organized as follows: <br /> <br />Group 1 <br />Aggregated structure location: (describe network position) <br />Desegregated structures: <br />Name and ID Location Structure # Conunent <br />...etc. <br /> <br />. <br /> <br />Group 2 <br />Aggregated structure location: (describe network position) <br />Desegregated structures: <br />Name and ID Location Structure # Comment <br />...etc. <br /> <br />The memo should describe special cases where the grouping required engineering judgment <br />or otherwise did not conform to the criteria listed under Task 2.03. A copy of the map produced in Task <br />2.03 should be included. It is expected that the memo will be 3 pages or less in length, excluding the <br />figure and table. <br /> <br />Make the Draft Task Memorandum available to the Division Engineer for his review. Hold a <br />meeting or teleconference with him to review the administration classes, RTi to provide written <br />comments on this draft memo. <br />4. STATE: Finalize memo. <br /> <br />Deliverables: <br />I. A single plot of three data series for cumulative decreed vs. administration date, <br />2, Ten classes of water rights for use in White River aggregation, <br />3, Draft memo describing process and results of this Task. <br />4, Final memo <br /> <br />. <br /> <br />Task 2.06 <br /> <br />Assign Return Flow Characteristics <br /> <br />Phase IlIa Scope of Services <br /> <br />1174 <br /> <br />A.1O <br /> <br />Jan31,l997 <br />