My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00271
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:48:45 AM
Creation date
10/9/2006 2:03:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/31/1997
Title
Boyle IIIa WRP Enhancement-Amendment 1-Phase IIIa Scope of Services-Exhibits A-D-Tasks 1-11.02
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. 9, STATE: Prepare Task Memorandum 3.11 containing approximately 2 pages oftex~describing the <br />results of this Task. The memo will include the following: <br />· Detailed list of reservoirs modeled in Phase II <br />· Detailed list of reservoirs to be aggregated and modeled in Phase IIla. <br />· Description of the geographical areas represented by the aggregation. <br />· Description of the stock pond analysis. <br />· Location and capacities of aggregated reservoir structures <br />· Description of the approach to assign water rights based on Task 3.05 results. <br />· Description of the development of the aggregated area-capacity curve and selection of <br />evaporation <br /> <br />Deliverables: <br />1. STATE: List of reservoirs modeled in Phase II and list of reservoirs to be aggregated and modeled <br />in Phase IIla. <br />2. STATE: Summary of stock pond capacities. <br />3. STATE: Determined locations of no more than four aggregated reservoirs and four aggregated <br />stock pond nodes. <br />4. STATE: Briefing to Boyle of aggregation process. <br />5. STATE: Modified StateMod input files (*.ope, *.tar, and *.eom). <br />6. STATE: Task Memorandum 3.11 describing the results of this Task. <br /> <br />. <br /> <br />Task 3.12 Review Phase II Instream Flows <br /> <br />Objective: Review Phase II instream flow rights and recommend refinements. <br /> <br />Prerequisite: None, <br /> <br />Assumption: Instreanl flow rights on the main stem and tributaries modeled in Phase II are included in <br />the Phase II model. <br /> <br />Approach: <br />I. Boyle: Review the instream flow structures, rights and demands modeled in Phase II. Identify <br />upstream and downstream reach locations necessary to model instream flows as a reach in Phase <br />IIla rather than a series of discrete points modeled in Phase II. No new instream flows are expected <br />to be added in this Task. <br />2. Boyle: Prepare a memorandum with approximately 2 pages of text summarizing the results of this <br />Task and any concerns identified. <br /> <br />Deliverables: <br />I, Boyle: Task Memorandum 3.12 describing the results of this Task. <br /> <br /> <br />Task3.13 Calibration Review <br /> <br />1152 <br /> <br />Phase IlIa Scope of Services <br /> <br />A.32 <br /> <br />Jan31,1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.