<br /> <br />. <br /> <br />Oeliverables: <br />I. STATE: Summary ofM&I consumptive uses modeled in Phase II. <br />2. STATE: Summary of M&I consumptive uses for Yampa River Basin from Consumptive use <br />report <br />3. STATE: Summary of aggregated M&I to be modeled in Phase IlIa. <br />4, STATE: Location of not more than four nodes to represent Phase IIIa M&I demands, <br />5, STATE: Briefing to Boyle of aggregation process, <br />6, STATE: Aggregated M&I demand files and paranleters, <br />7. STATE: Task Memorandum 3.10 describing the results of this Task. <br /> <br />Task 3.11 <br /> <br />Aggregate Reservoirs and Stock Ponds <br /> <br />Objective: Aggregate reservoirs and stock ponds not explicitly modeled in Phase II to allow <br />simulation of minor reservoirs and stock pond consumptive use in the basin. <br /> <br />Assumptions: TIle basis for aggregating reservoirs not modeled in Phase II is the OMI watright and <br />the CROSS database of water rights. TIle basis for aggregating stock pond consumptive use is the <br />consumptive use report <br /> <br />. <br /> <br />Approach: <br />1. STATE: IdentifY reservoIrs modeled explicitly in Phase II and sum their decreed storage <br />capacity. Using the DMI watright with the -aggres option, determine the total absolute decreed <br />storage in the basin. Calculate the amount of storage to be represented by aggregated reservoirs as <br />the difference between these two values, <br />2, STATE: Using the consumptive use report, identify the capacity of stock ponds, <br />3 ' STATE: Assign the aggregated reservoirs to no more than 4 locations in the basin using <br />engineering judgment Assign the aggregated stock ponds to no more than 4 locations in the basin <br />using engineering judgment F or budgeting purposes, assume aggregated reservoirs and stock <br />ponds will be distributed evenly to no more than 4 locations each (4 aggregated reservoirs and 4 <br />aggregated stock ponds), <br />4. STATE: At a regularly scheduled progress meeting, brief Boyle team on spatial aggregation of the <br />aggregated reservoirs and stock ponds, IncOlporate input as appropriate, before completing task, <br />5. STATE: Based on engineering judgment, generate a simple two point area-capacity curve and <br />identifY an existing Phase II evaporation station to model evaporation at the aggregated reservoirs <br />and stock ponds. <br />6. STATE: Develop the StateMod operating right (*.opr) and reservoir target file (*,tar) file to release <br />from the aggregated reservoirs such that 25% of the account volume is released in July, 50% <br />during August, and 25% during September. Set stock pond targets (* ,tar) to fulL This may include <br />using the time series utility, tstool. <br />7, STATE: For baseflow purposes, estimate aggregated reservoir and stock pond end-of-month <br />contents (* .eom) to equal target contents. <br />'8, STATE: Review the model network file (*.net) resulting from the OM! makenet in task 3,04 to <br />reflect the aggregated reservoirs and stock ponds. <br /> <br /> <br />Phase IlIa Scope of Services <br /> <br />A-31 <br /> <br />1153 <br /> <br />Jan 31, 1997 <br />