Laserfiche WebLink
<br />. <br /> <br />Deliverables: <br />I. Draft Engineering Report <br />2. Final Engineering Report <br />3. On-Line version of final report. <br /> <br />Task 2.17 <br /> <br />Modified Phase II Model <br /> <br />Objective: As additional information about the White River and other river basins is developed, some <br />of that data should be placed in relational database and some of that data should be incorporated into <br />the Phase II river basin models, <br /> <br />Approach: <br />I. R TIWR: As more correct information related to the Phase II modeling becomes available, the Phase <br />II White River Basin model will be modified to reflect that data, not to exceed 16 hours. <br /> <br />Deliverables: <br />I. Modified Phase II White River Basin Model. <br /> <br />'. <br /> <br /> <br />1164 <br /> <br />Phase III. Scope of Services <br /> <br />A.20 <br /> <br />J.n31,1997 <br />