Laserfiche WebLink
<br />. <br /> <br />changed from Phase II, the State will be notified of this and there will be no further formal <br />documentation of the baseline scenario data set. <br /> <br />Deliverables: <br />1. Memo describing modifications made to Phase II baseline scenario. <br />2. Updated StateMod input files reflecting revised baseline scenario. <br />3. If appropriate, updated documentation of baseline data set. <br /> <br />Task 2.16 <br /> <br />Prepare Final Documentation <br /> <br />Objective: Prepare a final engineering report in hard copy, which, when approved will be loaded onto <br />the CROSS system for On-Line access, <br /> <br />Assumptions: The formal and final engineering report will use as a base the draft chapters prepared by <br />the State for the data preparation Tasks, It is assumed that the Phase II data preparation chapters will be <br />left intact and supplemented by the Phase III aggregation concept. The calibration section of the final <br />report will involve the full replacement of the associated sections in the Phase II reports with Phase 1II <br />methodology and results. No On-Line presentation of engineering notes is required. On-Line <br />presentation of the formal engineering report will not be required until that written product is approved <br />by the State. <br /> <br />. <br /> <br />For the White River Basin, prepare the final documentation. As the activities for each <br />Task are performed, a written draft chapter describing the process and results will be prepared by the <br />consultant and submitted to the State, Significant /revisions to the process of the Task will cause a <br />regeneration of the written draft chapters and resubmitted to the State, <br /> <br />It is assumed that all word processing required to generate the final report will be <br />accomplished at and by the State e~cept for the calibration graphics and tables which will be the <br />responsibility of the consultant. ,~ <br /> <br />- <br /> <br />Approach: <br />1. State: Prepare a draft Engineering report to the State, following the same organization that was used <br />for the Phase II Engineering Reports: <br />I. Executive Summary <br />II. Introduction <br />III. Model Development <br />IV. Modeled Historic Data Description at 75% Basin Water Use <br />V, Aggregated Modeling Data Description, Task memos related to aggregation of <br />lITIgation structures, determination of water administration classes, calculation of administration <br />number, aggregation of M&I and storage use, additional instream flow rights, and generation of <br />demand time series will sections within this chapter. <br />VI. Calibration <br />2. State: State will finalize the report after receiving written comments from RTi. <br />3. STATE: State will create an On-Line representation of the final report. <br /> <br />1165 <br /> <br />Phase IlIa Scope of Services <br /> <br />A.19 <br /> <br />Jan31,1997 <br />