My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00271
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:48:45 AM
Creation date
10/9/2006 2:03:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/31/1997
Title
Boyle IIIa WRP Enhancement-Amendment 1-Phase IIIa Scope of Services-Exhibits A-D-Tasks 1-11.02
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br /> <br />scooping document does not account for more than a single review meeting, if additioniil meetings are <br />required, a change order will be requested, <br />4. RTIWR: Adjust, in cooperation with the State, the Phase III calibration paranleters as a result of the <br />calibration meeting. Calibration parameters for adjustment (to Phase III input files) will include: <br />aggregated node locations, aggregated return flow locations, efficiency of aggregated structures, <br />aggregated demand time series, adjustment to base hydrology. It is noted that adjustments to the Phase <br />II data set may be required. The time allocated to make calibration adjustments will not exceed 20 <br />hours. If more than 20 hours are required for the Phase III calibration, a change order will be required <br />for any additional calibration, <br />5. RTIWR: Produce the final visual comparisons (tables and graphs) for the following scenarios: <br />Phase III historic vs. Phase II historic, Phase III historic vs, gaged, and Phase III calculated vs. gaged, <br />6. STATE: Prepare a Task Memorandum documenting the calibration process and results, The <br />memorandum will generally describe the differences between the initial model run and the final run, It <br />will not log every interim run or trace the exact procedures followed. The plots created in Task 2.14,05 <br />will be included or referenced by filename in the Task Memorandum. RTi will provide written <br />comments on the memo before State finalization, <br /> <br />Deliverables: <br />I. State Mod simulations for three scenarios, <br />2. Big picture comparison plots between historical and simulated data for two scenarios. <br />3. Scoping meeting docwnentation, <br />4. Calibrated White River Basin model. <br />5. Graphical comparisons of calibration. <br />6. A memorandum documenting the calibration process and results. <br /> <br />Task 2.15 <br /> <br />Prepare Baseline Scenario <br /> <br />Objective: Develop a StateMod input data set that represents current conditions, This data set will be <br />available to future users who want to investigate the impact of new water rights or operations on the <br />basin by executing paired StateMod runs representing conditions before and after the contemplated <br />change. <br /> <br />Assumption: A baseline data set for the Phase II model will already be available, This task involves <br />updating those data sets with the aggregated nodes and modifying components of the Phase II model <br />data set which have changed in the course of developing the Phase III model. It is expected that no <br />new operational or administrative changes will need to be addressed in the White River basin. <br /> <br />Approach: <br />L STATE: Consult with Division engineers and State personnel to determine changes in water right <br />administration or operational procedures sinee the Phase II modeling effort. Develop modifications to <br />the Phase II asswnptions and explain those in a brief memo.. <br />2. RTIWR: Modify the Phase II StateMod input files to reflect the Phase II assumptions in <br />operational procedure, <br />3. Update the Phase II documentation of the baseline data set for any changes to the explicitly <br />operating structures. If Phase III baseline data operation of the explicitly operated structures is not <br /> <br />1166 A.IS <br /> <br />Phase IlIa Scope of Services <br /> <br />Jan 31, 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.