My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00006
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:47:49 AM
Creation date
10/9/2006 1:53:47 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272
Description
Colorado River - Colorado River Basin Salinity Control Program - CRBSCP
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
11/1/1990
Author
Unknown
Title
Meeting Municipal Needs with the Yuma Desalting Plant - Special Report - Second Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Of"; "I; . (~ <br />u/.;JJ:) <br /> <br />I <br />...... <br /> <br />ITEM MAIN ST. MAIN ST. EAST MESA <br /> 20 Mgal/d 40 Mgal/d 30 Mgal/d <br /> 15,447 u/Yr 3,(l,S94 U/Yr 23,171 U/Yr <br />DELIVERY CHARGE <br />AAe Canal 0.26 0.26 , 0.26 <br />Yuma Main Canal 11. 48 11. 48 <br />Gila Gravity canal 25.63 <br />POWER <br />Yuma Mesa Intake 3.72 3.72 <br />Plant Support 0.50 .0.50 0.50 <br />Distb. syst. PUlllp. 21.31 21.31 21.31 <br />CHEMICAL <br />Chlorine 0.88 0.88 0.88 <br />Alum. Sulfate 1.22 1. 22 1.22 <br />polymer 1. 67 1. 67 1. 67 <br />OPERATING LABOR <br />Coagulat./Filtrat. 21. 74 10.87 14.34 <br />MAINTENANCE LABOR * * * <br />LABORATORY SUPPORT ** ** ** <br />MAINT. MATERIALS <br />coagulat./Filtrat. 0.88 0.88 0.88 <br />Softening 0.12 0.12 0.12 <br />,;..'".. <br />TOTAL COST 63.78 52.91 66.81 <br /> <br />TABLE 7 <br />CITY FEATURES - OPERATING COSTS <br />.$/Acre-feet <br /> <br />* Included ~n Operat~ng Labor costs. <br />** Unknown, no change anticipated. <br /> <br />As reflected in the tabie approximately 90 percent of the city's <br />operating costs are accounted for by delivery charges, power <br />costs, and operating labor. As shown below, significant savings <br />can be realized with the use of the Desalting Plant. Delivery <br />charges are virtually eliminated, power costs are reduced by <br />about 50 percent, and during years of desalting (60 percent of <br />years), the incremental labor costs are eliminated as only minor <br />work would be involved to discharge and monitor the supply to <br />Yuma. <br /> <br />By proportioning the Desalting Plant operating costs to account <br />for the 40 percent/60 percent split in operations the operating <br /> <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.