Laserfiche WebLink
<br />. . . ,. . 7 <br />u l. ;-;:; <J <br /> <br />operating Labor <br />The rate for labor costs is the same for the city and the <br />Desalting Plant. Savings of scale are incurred with the larger <br />treatment capacities not requiring additional labor. For example <br />the labor cost of a single facility would be about half that of <br />one facility. Also with the Desalting Plant treatment, costs <br />for backup operators were not included as they would normally be <br />available under normal maintenance operations of the Desalting <br />complex. <br /> <br />Maintenance Labor and Laboratory support <br />Maintenance labor and laboratory support would be required for <br />the Desalting Plant for operation of the Solids Contact Reactor, <br />and All-American Canal intake, and the laboratory facilities. <br />However the costs do not include biological monitoring as that <br />would be performed by the city. <br /> <br />'" <br /> <br />Maintenance Materials <br />Unit costs are about the same for city or Desalting Plant <br />treatment of Colorado River water, and slightly less during years <br />of desalting operation. <br /> <br />...) <br /> <br />28 <br />