Laserfiche WebLink
<br />-- - -.' -~ <br /> - - --- - ----tr c-r D- .... .. ~~-- --- - -~~----_. - <br /> , , <br /> system and Treaty requirements. -~ <br /> ) <br /> Feasibility grade designs and estimates were prepared for four <br /> combinations to reach a 70 Mgaljd ultimate capacity. The four <br /> alternatives combined increasirig levels of Desalting Plant <br /> treatment with alternate City features. The alternatives - <br /> developed were not the full range of options that could be <br /> considered, but were designed to allow analysis and determine how <br /> the Desalting Plant could interact with existing and planned city <br /> features. <br /> The alternatives were compared to the Base City Plan as <br /> recommended by Carollo Engineers. The alternatives include: <br /> BASE CITY PLAN <br /> PLAllT CAPACITY CONSTR. FINISHED <br /> SITE Mga1sjd -(ac.ftjyr) OPER. BEGINS <br /> (Year) <br /> Main street 20 -(15,447) EXIST <br /> Main street 20 -(15,447) 1994 <br /> East Mesa 10 - (7,724) 2000 <br /> East Mesa 10 - (7,724) 2010 <br /> East Mesa 10 - (7,724 ) 2020 ..,J <br /> ALTERNATIVE 1 <br /> PLANT CAPACITY CONSTR. FINISHED <br /> SITE Mga1sjd -(ac.ft/yr) OPER. BEGINS <br /> (Year) <br /> Main street 20 - (15,447) EXISTS <br /> Desalt Plant 20 - (15,447) 1994 <br /> East Mesa 10 - (7,724) 2000 <br /> East Mesa 10 - (7,724) 2010 <br /> East Mesa 10 - (7,724) 2020 <br />