My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00006
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:47:49 AM
Creation date
10/9/2006 1:53:47 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272
Description
Colorado River - Colorado River Basin Salinity Control Program - CRBSCP
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
11/1/1990
Author
Unknown
Title
Meeting Municipal Needs with the Yuma Desalting Plant - Special Report - Second Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- --~-- --- ~-- e" ,- 3.... ._~- ----------.---- .-.-- ~_._.- --- <br /> ~- ,,-L..n -'-1 <br /> , <br /> ALTERNATIVE 2 <br /> PLANT CAPACITY CONSTR. FINISHED <br /> SITE Mgals/d - (ac',ft/yr) OPERe BEGINS <br /> (Year) <br /> Main street 20 - (15,447) EXISTS <br /> Main Street 20 - (15,447) 1994 <br /> Desalt Plant 30 - (23,171) 2000/10Mgd <br /> Desalt Plant EXISTS* 2010/10Mgd <br /> Desalt Plant EXISTS* 2020/10Mgd <br /> * Construct~on not staged. <br /> ALTERNATIVE 3 <br /> l'LANT CAl'ACITY CONSTR. FINISHED <br /> SITE Mga1s/d -(ac.ft/yr) OPERe BEGINS <br /> (Year) <br /> Main Street SHUT DOWN in 1994 <br /> -Desalt Plant 40 - (30,894) 1994 <br />~ <br /> East Mesa 10 - (7,724) 2000 <br /> East Mesa 10 - (7,724) 2010 <br /> East Mesa 10 - (7,724) 2020 <br /> . <br /> ALTERNATIVE 4 <br />- <br /> PLANT CAPACITY CONSTR. FINISHED <br /> SITE Mgals/d -(ac.ft/yr) OPERe BEGINS <br /> (Year) <br /> Main Street SHUT DOWN <br /> Desalt Plant 70 -_ (54,065) 1994/40Mgd <br /> Desalt Plant EXISTS* 2000/10Mgd <br /> Desalt Plant EXISTS* 2010/10Mgd <br /> Desalt Plant EXISTS* 2020/10Mgd <br /> * Construct~on not staged. <br /> In developing construction and operating costs for the Desalting <br /> Plant features Reclamation compared and selected a preferred <br /> intake source, clearwell design, and clarification process. The <br />::x <br />
The URL can be used to link to this page
Your browser does not support the video tag.