My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153869 Contract
CWCB
>
Loan Projects
>
Backfile
>
3001-3102
>
C153869 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2014 3:07:22 PM
Creation date
10/6/2006 12:27:21 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153869
Contractor Name
Brown and Caldwell
Contract Type
Grant
Water District
0
County
Jackson
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />.. llo <br /> <br />. <br /> <br />Exhibit A cont. <br /> <br />. <br /> <br />. <br /> <br />Table 3 <br />South Platte Decisiou Support System Feasibility Study - Task Summary <br /> <br />Task Title Ob;ective <br />I Introduction Review readily available publications and provide an introduction <br /> to the feasibility study and the study area in sufficient detail to <br /> allow the ,enort to stand bv itself. <br />2 Needs Meet with local representatives either independently or in groups <br /> and identify and describe the study area and needs that are to be <br /> met bv the SPDSS. <br />3 Data Assessment Assess the availability and quality of existing data and detennine <br /> what new data is necessary or desirable to develop a SPDSS that <br /> accurately and effectively addresses the needs identified in the <br /> previous Task. Prioritize new data collection based upon cost <br /> effectiveness in meeting those needs. Select a study period and <br /> identify new data that must be obtained to fill gaps or increase the <br /> SPDSS accuracy. If the study period selected is less than the entire <br /> oeriod of record, exolain the basis for the oeriod selected. <br />4 Decision Support System Review the existing DSS systems and identify components that <br /> Components can be used in SPDSS. Identify all the components required to <br /> develop the SPDSS that cost effectively address the needs <br /> identified in the previous Tasks. Describe the functionality of each <br /> component and the data requirements, includit:lg hardware and <br /> software reouirements as annronriate. <br />5 Alternatives Develop up to th,ee (3) SPDSS component alternatives <br /> considering needs, data availability) costs and other appropriate <br /> factors. <br />6 Proposed Alternative Develop and fully evaluate one (1) proposed SPDSS alternative in <br /> cousultation with the State and SPDSS Adviso'" Conunittee. <br />7 Renort Prenaration Incomorate nrevious task deliverables into a final revort. <br />S Management - Contractor Track work accomplished, maintain budget and schedule, and <br /> regularly report the status of work activities. In addition, promote <br /> communication among the State and Advisory Corrumttee team <br /> members in order to identify and resolve issues before they impact <br /> the schedule or budget. <br /> The prime contractor will manage the contractor component of the <br /> SPDSS feasibility study. At least one key individual will conduct <br /> the Interviews performed in Task 2.2, attend the Progress <br /> meetings performed in Task 8.3 and attend the Advisory meetings <br /> ne,formed in Task 8.4. <br />9 Management - State Provide direction and resolve issues associated with this scope of <br /> work. Review deliverables, track work accomplished, and <br /> evaluate budget and schedule. Schedule Advisory Committee <br /> meetinl!s. <br /> <br />August 1, 2001 <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.