My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153869 Contract
CWCB
>
Loan Projects
>
Backfile
>
3001-3102
>
C153869 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2014 3:07:22 PM
Creation date
10/6/2006 12:27:21 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153869
Contractor Name
Brown and Caldwell
Contract Type
Grant
Water District
0
County
Jackson
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />. <br /> <br />Exhibit A cont. <br /> <br />. <br /> <br />.' <br /> <br />... ." . <br /> <br />, <br /> <br />Scope of Work Format Because the major deliverable required by the SPDSS feasibility <br />study is a feasibility report that is similar to that developed for CRDSS and RGDSS, this <br />scope of work has been separated into tasks which generally represent sections <br />anticipated for the report (Table 3). Exceptions to the report format are as follows: <br /> <br />. The draft Data Collection Report, Task 3.1, needs to be provided as a stand- <br />alone document by November 30, 1999. Following it's submittal, the data <br />collection report is expected to be reformatted to become chapter 3 of the <br />Draft and Final Feasibility Report. <br /> <br />. Task 7 - Report, Task 8 - Contractor Management and Task 9 - State <br />Management are related to developing a final report and managing the study. <br /> <br />Each Task is broken into a responsibility, objective, approach and deliverable section. <br />The responsibility section is self-explanatory. The objective section is intended to provide <br />a brief summary of the Task. The approach section is intended to provide a description of <br />task activities in enough detail to identify costs and deliverables, the deliverable section is <br />intended to provide a brief check list of deliverables resulting from performing the task <br />activities identified in the approach section. In general, the numbering used in the <br />approach section corresponds to the numbering used in the deliverable section. <br /> <br />Work Product Ownership All work products developed under this scope of work will <br />be the property of the State of Colorado and will not be distributed or used by the <br />Contractors for other than project purposes without the express written consent of the <br />State of Colorado. <br /> <br />August 1,2001 <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.