My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153869 Contract
CWCB
>
Loan Projects
>
Backfile
>
3001-3102
>
C153869 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2014 3:07:22 PM
Creation date
10/6/2006 12:27:21 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153869
Contractor Name
Brown and Caldwell
Contract Type
Grant
Water District
0
County
Jackson
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />. <br /> <br />Exhibit A conI. <br /> <br />. <br /> <br />..\ 1/. . <br />,. <br /> <br />1. Draft SPDSS Alternative Section. <br />2. Final SPDSS Alternative Section with State and Advisory Committee comments. <br /> <br />Task 6 - Proposed Alternative Section <br /> <br />Responsibility: Contractor <br /> <br />Objective: Develop and fully evaluate one (1) proposed SPDSS alternative in consultation <br />with the State and SPDSS Advisory Committee. <br /> <br />Approach: <br />1. Preliminary Proposed Alternative: Fine-tune one of the three alternatives developed <br />previously into a preliminary proposed alternative. Provide to the State and Advisory <br />Committee for comment. <br />2. Draft Proposed Alternative Section: Include State and Advisory Committee <br />comments into a draft Proposed Alternative Section. Develop a Scope of Work to <br />develop the proposed alternative with a level of detail that is similar to this scope and <br />adequate to provide an accurate cost estimate. Develop a cost estimate that includes <br />consideration of contractor fees, hardware and software needs and State management <br />costs. Develop a schedule that includes a phased development with key milestones. <br />3. Final Proposed Alternative Section: Include State and Advisory Committee <br />comments into a final Proposed Alternative Section. <br /> <br />Deliverable: <br />1. Preliminary Proposed Alternative. <br />2. Draft Proposed Alternative Section. <br />3. Final Proposed Alternative Section with State and Advisory Committee comment. <br /> <br />Task 7 - Report <br /> <br />Responsibility: Contractor <br /> <br />Objective: Incorporate previous task deliverables into a final report. <br /> <br />Approach: <br />l. Draft Report: Review and consolidate the previous Task deliverables into a Draft <br />SPDSS Feasibility Report. Incorporate detailed information required for project <br />backup into appendices. The type of data expected to be included in the appendices <br />includes but is not limited to meeting minutes, comment sheets, data assessment <br />tables, etc. Provide 50 copies of the report and Appendices and one copy in Microsoft <br />Word format. <br />2. Final Report: Include State and Advisory Committee comments into a final SPDSS <br />Feasibility Report. Provide 50 copies of the report and Appendices and one copy in <br />Microsoft Word format. <br /> <br />Deliverable: <br />l. Draft SPDSS Feasibility Report. <br /> <br />August I, 2001 <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.