<br />in the preferred plan unless a major problem is found as a result of this <br />study, The second priority is Beaver Creek Dam site if Plateau is not <br />feasible, If neither of those sites are found to be feasible, additional <br />evaluations will be necessary to determine other suitable sites, The studies <br />will include: topography of the Plateau and Beaver dam and reservoir sites; <br />determination of the optimum reservoir size; preparation of appraisal <br />designs and costs for both sites; evaluation of hydrology; and geotechnical <br />field studies of the preferred dam site, <br /> <br />2,c,2, Small Upstream Storage Sites - Evaluation of small storage sites <br />(surface or alluvium) along the Dolores River upstream of McPhee <br />Reservoir will be conducted to provide a firm water supply for plans of <br />augmentation andlor exchange, The potential storage options may include: <br />subsurface alluvial sites in the Dolores River alluvium; gravel pit reservoirs; <br />raising the spillway at the existing Groundhog Reservoir on a tributary to <br />the West Fork of the Dolores River; inventory of other storage options <br /> <br />2, c.3, Dove Creek Canal Storage Sites - Storage sites along the Dove Creek <br />Canal (a facility of the Dolores Project) are needed to provide water during <br />periods the canal is not operated or is at full capacity, These sites include, <br />though not limited to, Sharps Creek reservoir and Monument Creek <br />reservoir. <br /> <br />2,cA Use of Existing Storage Sites -The potential to utilize all or portions <br />of existing reservoirs will be evaluated, The existing reservoirs include: <br />Totten, Groundhog, Narraguinnep, and McPhee, <br /> <br />2,d, Preliminary analysis of the Dolores Project facilities has shown that the Dove <br />Creek Canal can carry water for an additional 4,100 acres through Reach 1, about <br />2,300 acres through Reach 2, and 1,100 acres through Reach 3, The available <br />capacity of the canal to serve additional lands will be specifically determined, In <br />order to utilize Dolores Project facilities, a carriage contract is necessary with the <br />Bureau of Reclamation. <br /> <br />The elCisting pumping plants to serve irrigated lands can potentially serve an <br />additional 1,200 acres provided that distribution pipelines are' constructed, In order <br />to utilize this existing capacity, WET PACK anticipates increased irrigation up to <br />the capacity of the existing facilities, The extra capacity of the pump stations will <br />be finally determined, <br /> <br />The delivery pipelines and pumps necessary to convey the water from the Dove <br />Creek Canal to the potentially irrigated lands will be planned and sized with <br />construction cost estimates. <br /> <br />Page 5 12/.30/98 F;Uolm\memo\WETPACK SCOPE OF WORK.doc <br />