Laserfiche WebLink
<br />"., "\ <br /> <br />Step 3 - Formulation and Evaluation of Alternative Plans <br /> <br />3.a, Based on the water sources and water needs identified in the above tasks, <br />alternative plans will be formulated and evaluated. The facilities could include <br />existing and new: pipelines; canals, pumps, reservoirs, etc" Appraisal level <br />designs, cost estimates, water operation modeling, water yield estimates, <br />environmental and recreation analysis, and financial analysis will be prepared for <br />the alternatives, A broad range of alternatives will be formulated, including the no <br />action alternative, and evaluated in order to assess tradeoffs between various plans, <br />such as: costs, water provided, financing, environmental and recreation issues, etc,. <br /> <br />3,b, Preliminary assumptions concerning availability of up front funding and <br />annual revenues from water users benefiting from the additional water will be <br />estimated, For instance, what funding is available for fishery water or how much <br />can the San Juan County, Utah water users afford to pay for raw domestic water. <br />The estimates will be used in the economic analysis in assessing the feasibility and <br />identifying differences between the alternatives, <br /> <br />3,c, Evaluate each of the alternatives using the evaluation factors specified in the <br />CWCB Construction Fund Guidelines as well as any other factors developed in <br />consultation with the CWCB and other entities, <br /> <br />3.d, The alternatives will be presented to interested entities,. at established Dolores <br />River basin coordination meetings and possibly public meetings for discussion and <br />comment, There may be one or two iterations of presentations to address various <br />alternatives, <br /> <br />3, e, The alternative plans. will be evaluated by the District,. CWCB, involved, <br />entities, and staff in an iterative process until all of the appropriate alternatives have <br />been evaluated, <br /> <br />Step 4 - Selection of a Preferred Plan <br /> <br />A preferred plan will be developed through the alternative analysis process described iI:\ <br />Step 3. The plan may include phases to meet present and future water needs so that <br />facilities are not constructed until those needs develop, The plan will be selected by the <br />District Board of Directors with input from all ofthe involved entities and individuals. <br /> <br />Step 5 - Feasibility Level Analysis <br /> <br />5,a. Feasibility level plans, designs, geotechnical analysis, yield analysis, cost <br />estimates, and general construction schedule will be prepared for the selected plan, <br />The CWCB criteria for feasibility level plans will be used to conduct the <br />engineering analysis. <br /> <br />Page 6 12/30/98 F;Uoim\memo\WETPACK SCOPE OF WORK.doc <br />