My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01584
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:44:25 AM
Creation date
10/6/2006 12:25:59 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153576
Contractor Name
URS Consultants
Water District
0
County
Mesa
Bill Number
Sb 89-85
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />. <br /> <br />. <br /> <br />.- <br /> <br />, <br /> <br />, <br /> <br />8. Electrical engineering will consist of the estimation of building and site power <br />and control requirements, power distribution facility needs, and power-service <br />to the site, <br /> <br />9. Mechanical engineering services will consist of estimation of costs for <br />mechanical equipment and mechanical equipment selection assistance to the <br />hatchery design team, <br /> <br />10. Once the above activities are completed, bills of quantities will be developed. <br />These will categorize the materials of construction and installed equipment. <br />Quantities will be developed and unit prices applied in order to generate <br />estimated costs of construction. These estimates, one for each site for the <br />selected scenario, will form the basis for the conceptual-level estimates. For <br />these estimates, quantities will be scaled, based upon the different sizes or <br />capacities of the other scenarios, and the previously derived unit costs will be <br />applied, The estimates of cost so C1erived will permit a direct comparison of the <br />relative construction C05tS of each scenario at each of the three sites. If the <br />CWCB desires, the construction costs could be extended to include overhead, <br />engineering, and contingency COSts in order to determine the overall estimated <br />costs of hatchery development, <br /> <br />W or k Products: <br /> <br />For the Scenario 2 site: <br /> <br />1. Site and facility layouts. <br /> <br />2, Definitions of major facilities. <br /> <br />3, General building layouts. <br /> <br />IS <br />
The URL can be used to link to this page
Your browser does not support the video tag.