Laserfiche WebLink
<br />, <br /> <br />. <br /> <br />. <br /> <br />, <br /> <br />Task 7: <br /> <br />Hatchery Design <br /> <br />Objective: <br /> <br />For each of the three potential sites under consideration, develop a feasibility <br />level design for Scenario 2 and conceptual-level designs for Scenarios I and 3, <br />This will include site layouts for Scenario 2 at each of the three sites, <br />appropriate cross-sections, and lists of major equipment. The feasibility-level <br />designs will be developed in sufficient detail to enable quantities and costs to <br />be estimated. <br /> <br />Responsibility: <br /> <br />URS and FishPro will take the lead, with all Subconsultants contributing. <br /> <br />Methodology: <br /> <br />i. From the design criteria previously developed, a typical site layout will be <br />prepared. This will depict areas devoted to major facilities and their inter. <br />relationships. From thi5, the major facilities will be defined. These will include: <br /> <br />a. Administration, research, and laboratory facilities, and caretaker <br />housing, <br /> <br />b. Spawning, hatching, and rearing facilities. <br /> <br />c. Broodstock, refugia, and stocking (as necessary) holding areas. <br /> <br />d. Maintenance and storage areas. <br /> <br />e. Water diversion and conveyance facilities and water and effluent <br />treatment facilities. <br /> <br />f. Water heating facilities. <br /> <br />g. Site access. <br /> <br />h. Utilities, <br /> <br />2, A flow diagram will be developed to depict overall water requirements and the <br />inter-relationship of facilities. <br /> <br />3. General building layouts will be developed to depict special arrangements, space <br />allocations and major equipment and facilities. . <br /> <br />4, The layout of facilities in the yard areas will be refined to fit each site being- <br />evaluated. Each facility, such as a solar pond, raceways, rearing ponds. and <br />holding ponds will be dimensioned and the manner of construction considered. <br />This may include concrete tanks, earthen dikes with liners, and effluent settling <br />ponds. Consideration will be given to foundation requirements and the <br />suitability of on-site materials for fill. <br /> <br />5. Once the major facilities arc sited, access requirements will be determined. <br /> <br />6. Major piping will be sized and located. <br /> <br />7, Visitor center facilities will be defined, in coordination with the CWCB. <br /> <br />14 <br />