Laserfiche WebLink
<br />> <br /> <br />. <br /> <br />. <br /> <br />'" <br /> <br />Task 8: <br /> <br />Cost Estimates By Alternative <br /> <br />Objective: <br /> <br />Prepare cost estimates for each of the three scenarios at each of the three <br />alternative sites, Scenario 2 will be a feasibility-level cost estimate and <br />Scenarios I and 3 will be prorations of the Scenario 2 cost estimate. <br /> <br />Responsibility: <br /> <br />URS will take the lead with input from the other team members. <br /> <br />Methodology: <br /> <br />I. For each of the three alternative sites, a detailed (feasibility level) cost estimate, <br />based on unit prices, will be prepared for the Scenario 2 facility. <br /> <br />2. For each of the three alternative sites, a conceptual-level cost estimates, based <br />on prorated Scenario 2 costs, will be prepared for the Scenario I and 3 facilities, <br /> <br />3. Unit prices for the detailed cost estimates will be based on current unit price <br />data from sources such as: <br /> <br />a, Colorado Department of Highway Cost Data <br />b. Means Cost Data <br />c. URS and Subcontractors cost data resources <br />d. Colorado Con tractors Association <br />e. Available information from existing hatchery facilities <br /> <br />Work Products: <br /> <br />Cost estimates will be prepared for each alternative, for each scenario, in Lotus 1-2-3 <br />format, with sources of pricing information detailed. <br /> <br />16 <br />