Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE 7-4 <br /> <br />BEAVER RESERVOm ALTERNA TNE 4 COSTS <br />BREACH DAM <br /> <br />ITEM <br /> <br />DESCRIPTION <br /> <br />ESTIMATED <br />COST <br /> <br />1. <br /> <br />2. <br /> <br />3. <br /> <br />4. <br /> <br />5. <br /> <br />6. <br /> <br />7. <br /> <br />8. <br /> <br />Mobilization <br /> <br />Excavation <br /> <br />Outlet Works Removal <br /> <br />Stream Rehabilitation <br /> <br />Overseeding" ~ <br /> <br />-..~-- <br /> <br />, -,~ <br /> <br />- <br />Miscellaneous, 5% <br /> <br />DesignCosts <br /> <br />Construction Observation <br /> <br />Contingency, 15% <br /> <br />$10,000.00 <br />$400,000.00 <br /> <br />$10,000.00 <br />$30,000.00 <br />$60,000.00 <br />$21,000.00 <br />$30,000.00 <br />$5,000.00 <br /> <br />$79,650.00 <br /> <br />~. -TOTAL ' <br /> <br />$645,650.00 <br /> <br />~,--~. <br /> <br />-- .;,. 23067/RITI-4.xLS 9/3/93(3:33 PM)/RPT <br /> <br />Sheet 1 of 1 <br />