Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE 7-3 <br /> <br />BEAVER RESERVOIR ALTERNATIVE 3 COSTS <br />GROUT CURTAIN CUTOFF WALL <br /> <br />ITEM <br /> <br />DESCRIPTION <br /> <br />ESTIMATED <br />COST <br /> <br />1. <br /> <br />Mobilization <br /> <br />$15,000.00 <br /> <br />2. <br /> <br />Site Preparation* <br /> <br />$50,000.00 <br /> <br />3. <br /> <br />Grout Curtain Construction <br /> <br />$825,000.00 <br /> <br />4. <br /> <br />Miscellaneous, 10% <br /> <br />$89,000.00 <br /> <br />5. <br /> <br />Design Costs <br /> <br />$30,000.00 <br /> <br />--. , <br /> <br />6. <br /> <br />Construction ObserVation <br /> <br />$23,000.00 <br /> <br />7. <br /> <br />Contingency, 20% <br /> <br />$195,800.00 <br /> <br />TOTAL <br /> <br />$1,227,800.00 <br /> <br />*Includes removing top 1 O.feetof dam. <br /> <br />-~. <br /> <br />-' <br /> <br />'-- 23067/RlTI-3Ja.S 913193(3:48PM}fRPf <br />-~ <br /> <br />Sheet 1 of 1 <br />