Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE 7-2 <br /> <br />BEAVER RESERVOIR AL TERNA TIVE 2 COSTS <br />SOIL-BENTONITE SLURRY CUTOFF WALL <br /> <br />ITEM <br /> <br />DESCRIPTION <br /> <br />ESTIMATED <br />COST <br /> <br />4. <br /> <br />6. <br /> <br />7. <br /> <br />1. <br /> <br />Mobilization <br /> <br />2. <br /> <br />Site Preparation* <br /> <br />3. <br /> <br />Cement-Bentonite Wall Construction <br /> <br />Miscellaneous, 1 0% <br /> <br />- <br /> <br />5. <br /> <br />Design Costs <br /> <br />Construction Observation <br /> <br />Contingency, ~O% <br /> <br />$25,000.00 <br /> <br />$125,000.00 <br /> <br />$448,000.00 <br /> <br />$59,800.00 <br /> <br />$30,000.00 <br /> <br />$23,000.00 <br /> <br />$131,560.00 <br /> <br />TQTAL <br />* includes removing top 10. feet of dam and access road improvements. <br />.------ '" <br /> <br />-,,"-/ <br /> <br />~~ :"230671R1TJ.2.xLS 913193(3:49PM)/RPT <br /> <br />'. <br /> <br />$842,360.00 <br /> <br />Sheet 1 of 1 <br />