Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE 7-5 <br /> <br />BEAVER RESERVOIR ALtERNATIVE 5 COSTS <br />RESERVOIR SEEPAGE BLANKET <br /> <br /> ESTIMATED <br />ITEM DESCRIPTION COST <br />1. Mobilization $20,000.00 <br />2. Grading $82,500.00 <br />3. Riprap Removal and Placement $2,000.00 <br />4. Bedding Fill $2,000.00 <br />5. GLC Installation $110,400.00 <br /> . <br />6. Cover Fill $28,000.00 <br />7. General Fill $9,000.00 <br />8. . Miscellaneous, 5% $12,245.00 <br />9. Design Costs $12,000.00 <br />10... ~"'~'Construciion Observation $18,000.00 <br />U. Contingency, 15% $39,921.75 <br />", TOTAL $336,066.75 <br /> <br />~ <br />~'-v ~/ <br />':"-: ::"' 23067/R11i-DCLS 913193(3;4$ PMYRPT <br /> <br />Sheet 1 of 1 <br />