My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153705 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C153705 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:33 AM
Creation date
10/6/2006 12:25:25 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153705
Contractor Name
Beaver Reservoir Company
Contract Type
Loan
Water District
59
County
Gunnison
Bill Number
SB 94-029
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />7.5 DESCRIPTION OF SELECTED ALTERNATIVE <br /> <br />7.5.1 General <br /> <br />This section presents a detailed description of the recommended alternative to <br />rehabilitate Beaver Reservoir. The recommended alternative, partial reservoir seepage <br />blanket will consist generally of the following tasks: <br /> <br />1. Site Grading <br />2. Riprap Removal and Replacement <br />3. Bedding Fill <br />4. GCL Installation <br />5. Cover Fill <br /> <br />The following presents details of each of the steps. A site plan is shown on Figure 7-1 <br />and a cross-section is shown on Figlire ~7-2. __. <br /> <br />7.5.2 Site Grading <br /> <br />Site preparation will consist of excavating existing blanket soils and grading to 3: 1 slopes <br />or flatter in the portion of the reservoir to be lined as shown in Figure 7-1. The soil will <br />be stockpiled for later use in the project. Embankment materials will be left <br />undisturbed. <br /> <br />\ <br /> <br />'~--'--"'" <br /> <br />7.5.3 Riprap Reiiioval/Replacement <br /> <br />Riprap'will be, removed from the area along the perimeter of the upstream face of the <br />embankmenL\Vnereit meets the portion of the reservoir floor to be lined. The riprap <br />will then be replaced over the GCL and cover in this same area. <br /> <br />7.5.4 Bedding FiII <br /> <br />A thin layer of fill, approximately 6 inches in thickness will be placed over the exposed <br />bedrock in preparation for placement of GCL materials. <br /> <br />-> -"" <br /> <br />23067/Rl.7 09-03-93(3:4Zpm)/RPT <br /> <br />7-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.