My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153705 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C153705 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:33 AM
Creation date
10/6/2006 12:25:25 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153705
Contractor Name
Beaver Reservoir Company
Contract Type
Loan
Water District
59
County
Gunnison
Bill Number
SB 94-029
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />-A <br /> <br />'-' <br /> <br />The cost summary is: <br /> <br />Alternative Description Estimated Cost <br />1 Cement-bentonite slurry cutoff wall $1,064,120 <br />2 Soil-bentonite slurry cutoff wall 842,360 <br />3 Grout curtain cutoff wall 1,227,800 <br />4 Breach dam 648,800 <br />5 Partial reservoir seepage blanket 341,400 <br /> <br />7.4 ALTERNATIVE EVALUATIONS <br /> <br />Alternative 5, line a portion of the reservoir and the upstream face of the dam, was <br />selected as the preferred alternative for the following reasons: <br /> <br />· The least design effort. 'The design, can be completed with the information <br />'- <br />already obtained. Alternatives 1 through 3 may require additional field <br />investigations to better'define costs of construction. <br /> <br />· Construction logistics are simpler. The construction for this alternative <br />can be completed with conventional construction equipment with using the <br />existin~ access to the site. Alternatives 1-3 would require special road <br />work to access the site, thereby lengthening the construction schedule and <br />adaitional costs. <br />I .~ <br /> <br />· Construction time schedule is shorter. <br /> <br />· "The 'alternative is significantly less expensive than Alternatives 1 through <br />3 aiids,?mewhat less expensive than Alternative 4. <br /> <br />23067/Rl.7 09-03-93(3:24pm)/RPT <br /> <br />7-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.