My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153604 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C153604 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2009 9:26:17 AM
Creation date
10/6/2006 12:25:14 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153604
Contractor Name
Julesburg Irrigation District
Contract Type
Loan
Water District
64
County
Logan
Bill Number
SB 86-27
Loan Projects - Doc Type
Feasibility Study
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />CHAPTER VII <br />PROJECT EVALUATION <br /> <br />. <br /> <br />The primary source of funding for the District is the district tax assessment against the <br />19,134 acres wUhln the District. AddUional sources of Income Include water assessments, Interest <br />earned on deposUs, and other miscellaneous sources, The District has been conducting major dam <br />rehabllUatlon measures since 1985 which have been funded oUl of the general operating budget for <br />the District. In order to pay for the recent repair measures on Dams No, 2 and 3 and in anticipation <br />of fUlure expendUures for repairs, the District has been increasing the acreage assessment on a <br />fairly regular basis since 1984, The recent assessment history is listed in Table 3, The $2,00 <br />surcharge (assessment increased to $18,00 per year) in 1991 will generate an additional $38,300 <br />per year which will be allocated exclusively for repayment of future debt incurred in the course of <br />additional rehabllUationjreplacement. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />During the 1986 through 1989 period (1989 is the latest year for which information Is <br />available), the District has been spending an average of nearly $50,000 per year for major <br />engineering exploration and design, and for construction of embankment rehabilitation measures <br />for Dams No, 2 and 3, The distribution of the extraordinary expenses during the four year period <br />was estimated from the total expense and the period during which repairs were performed, Within <br />this periOd, the District also purchased several major pieces of construction and maintenance <br />equipment, which are reflected In the "Operations and Maintenance" totals, The overall District <br />deficit averaged less than $3,000 per year, The District's balance sheets for 1986 through 1989 are <br />summarized in Table 3, Recently, the District has operated with a fairly substantial cash reserve for <br />emergencies, The end-of-year emergency reserve balance, which has averaged aboUl $100,000 In <br />recent years, Is shown on the last line of Table 3, <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Also shown in Table 3 Is a projection of future revenues and expenditures which <br />demonstrate the District's ability to repay the CWCB loan. Financing for the lqan repayment Is <br />based upon the 1991 increase in assessments and the reduction of extraordinary engineering and <br />construction expenses, The projection amounts to aboUl $50,400 total available for the loan <br />repayment and other "new" uses, such as contribUlions to an emergency reserve fund, Note that <br />the Interest income and "othe(' income, which has historically averaged aboUl $36,800 per year, has <br /> <br />. <br /> <br />18 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.