My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153604 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C153604 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2009 9:26:17 AM
Creation date
10/6/2006 12:25:14 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153604
Contractor Name
Julesburg Irrigation District
Contract Type
Loan
Water District
64
County
Logan
Bill Number
SB 86-27
Loan Projects - Doc Type
Feasibility Study
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />The tunnel linings were also designed to wkhstand full hydrostatic internal pressures wkh nominal <br />external confinement. The need for an energy dissipation structure has been evaluated, The <br />calculations included in Appendix J have shown that an armored stilling pool will suffice for energy <br />dissipation. <br /> <br />. <br /> <br />. <br /> <br />Reservoir sluice gates will be designed by the supplier based upon operating specifications <br />provided by the design engineer, Additional design considerations are the intake trash rack and the <br />upstream slope protection, These will be designed as generally recommended by the State <br />Engineer and the "Design of Small Dams," The District typically uses broken concrete fragments <br />for erosion and slope protection on the Julesburg Dams, This practice has occurred for many years <br />due to the relative abundance of salvaged concrete and the high cost of imported hard rock rlprap, <br />It Is proposed to use broken concrete section from the District's existing stockpiles as well as <br />concrete obtained from the demolition of concrete structures associated with the reconstruction of <br />the outlet works, The cost for this "riprap" is expected to be relatively low. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />17 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.