<br />Cost Estimate <br /> <br />The estimated total project cost is $72,500. <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />Total Cost <br /> <br />$ 1,500 <br />$71,000 <br /> <br />$72,500 <br /> <br />1. Planning and Design Costs <br />2. Construction Cost with Contingency <br /> <br />A more specific cost break down is as follows: <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />Total Cost <br /> <br />$ 3,500 <br />$ 4,000 <br />$ 8,500 <br />$12,500 <br />$ 2,500 <br />$24,500 <br />$ 8,000 <br />$ 7,500 <br />$ 1,500 <br /> <br />$72,500 <br /> <br />1. Mobilization <br />2. Demolition <br />3, Earthwork <br />4. Sheet Piling <br />5. Lift Gates <br />6. Concrete <br />7. Reinforcing Steel <br />8. Contingency <br />9. Planning and Design Costs <br /> <br />Implementation Sohedule <br /> <br />The following schedule is proposed for implementation of the <br />project: <br /> <br />Task <br />~Complete Final Design <br />2. Start Construction <br />3. Complete Construction <br />4. project is Operational <br /> <br />Date <br />03/28/03 <br />04/04/03 <br />04/18/03 <br />04/19/03 <br /> <br />Feasibility Study <br />Lowline Ditch Company <br />Diversion Structure <br />March 2003 <br /> <br />6 <br />