Laserfiche WebLink
<br />. , <br /> <br />. <br /> <br />. <br /> <br />4....... <br /> <br />a. Establishment and maintenance by the Contractor of a <br /> <br />field offi.ce in the Cortez-Towaoc area. The office will <br /> <br />be manned as the work requires and will provide <br /> <br />construction management services for constructing the <br /> <br />Towaoc pipeline project, The date when the office will <br /> <br />be first opened must be approved by the State, <br /> <br />. <br /> <br />b. Participation as advisors to the State in negotiations <br /> <br />between the State and the Constructor to establish that <br /> <br />the requir~d work can be satisfac~orily performed by the <br />'/ .y I' <br />Constructor. and to establish a reasonable project <br />., <br />construction contract p~ice, <br />. .'1 <br /> <br />c. Participation in pre-construction activities as <br /> <br />necessary. <br /> <br />d. Attend conferences with the State and/or other <br /> <br />interested parties as may be needed, as determined by <br /> <br />the State, <br /> <br />e. As the State's representative, subject always to the <br /> <br />direction and control of the State's authorized officers <br /> <br />or their designated representative, act as liaison <br /> <br />between the State, the Constructor. and the Ute Mountain <br /> <br />ute Tribe. <br /> <br />f. In performing the construction management work, the <br /> <br />Contractor is expected as a minimum to: <br />-3- <br />