Laserfiche WebLink
<br />. . <br /> <br />,. <br />, <br /> <br />. <br /> <br />. <br /> <br />...- ...... <br /> <br />(1) Review the Constructor's performance and ensure <br />that~he project is being constructed according to <br /> <br />approved drawings and specifications, and perform <br /> <br />quality assurance inspection of work and in a <br /> <br />timely manner. <br /> <br />(2) Coordinate and direct p~curement of, and receive <br /> <br />on the site and inspect all permanent materials <br /> <br />necessary for the project, including the selected <br /> <br />pipe ~, <br />;; <br /> <br />.. <br /> <br />., <br /> <br />, <br /> <br />~ <br /> <br />(3) Keep photographic ~nd dajly report records of <br />. .', <br /> <br />construction ~ro~ress and submit such records <br />weekly to the State, <br /> <br />(4) Review and approve any necessary shop and working <br />drawings furnished by the. Constructor for <br />conformance with the design concept. <br /> <br />(5) Interpret the intent of the project drawings and <br />specifications to protect the State against <br /> <br />defects and deficiencies in construction on the <br /> <br />part of the Constructor, <br /> <br />(6) Establish baselines for locating the work; <br />together with a suitable number of bench marks <br /> <br />adjacent to the work as shown in the contract <br /> <br />documents, <br /> <br />-4- <br />