My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00465
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00465
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:28:06 AM
Creation date
10/6/2006 12:08:20 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150083
Contractor Name
John Peroulis and Sons Partnership
Contract Type
Loan
Water District
44
County
Moffat
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'. <br />~ '":1 <br /> <br />. <br /> <br />. <br /> <br />9.A.(9) The engineer shall give the State Engineer at least <br />10 days advance written notice of the engineer's final construction <br />,inspection. <br /> <br />9.A. (10) .The engineer shall notify the State Engineer of <br />the completion of the construction in accordance with Rule 10. ' <br /> <br />9.B. For Minor, Class I Dams, and Large, Intermediate, and Small <br />'dams rat~d as Class 'II. the owner shall provide an engineer <br />experienced in dam design and construction, who shall be responsible <br />for the following: <br /> <br />9,B.(1) Not less than 30 days prior to construction or as <br />soon as possible for dams whose construction season is affected by <br />freezing weather, the engineer must notify the State Engineer in <br />writing of the following: <br /> <br />9.B.(1)(a) The date of the start of construction; <br /> <br />9.B.(1)(b) The names and qualifications of the engineer <br />and staff to be used on the project; <br /> <br />9.B.(1)(c) A schedule 'for construction observation by <br />the engineer, including the foundation of the dam; <br /> <br />9.B.(1)(d) Identification of the firm that will conduct <br />the construction material tests; and <br /> <br />9.B.(1)(e) 'A schedule of the construction material <br /> <br />tests. <br /> <br />. <br /> <br />9,B.(2) The engineer shall observe the construction .of the <br />dam. It is the engineer's responsibility to make periodic visits to <br />observe the progress and. quality of the construction in order to <br />determine whe1;her the construction' is proceeding in accordance with <br />the approved plans and specifications. The engineer shall endeavor to <br />guard against defects and deficiencies in the construction of the dam, <br />and shall disapprove or reject the work failing to conform to the <br />approved plans and specifications. Photographs of the progress of the <br />construct i on shall be taken for the record. <br /> <br />9.B.(3) The ~ngineer shall submit periodic reports as <br />requested by the State Engineer and shall compile a record of all <br />tests conducted, a summary of geologic information as related to the <br />foundations, and any problems and remedies, for submittal at the end <br />of construction. <br /> <br />. <br /> <br />. 33 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.