My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00465
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00465
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:28:06 AM
Creation date
10/6/2006 12:08:20 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150083
Contractor Name
John Peroulis and Sons Partnership
Contract Type
Loan
Water District
44
County
Moffat
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />9.A.(4) The engineer shall observe the construction' of the <br />dam. It is the engineer's responsibility to make frequent periodic <br />visits to observe the progress and quality of the construction to <br />determine whether the construction is proceeding in accordance with <br />the approved plans and specifications. The engineer shall endeavor to <br />prevent defects and. deficiencies in the construction of the dam and <br />appurtenant structures, and shall disapprove or reject work failing to <br />conform to the approved plans and specifications. <br /> <br />9.A.(5) The engineer shall maintain a record of con- <br />struction, which as a minimum~ shall include: <br /> <br />. <br /> <br />9.A.(5)(a) Daily activity and progress reports; <br /> <br />9.A. (5) (b) All test results pertaining to construction; <br /> <br />9.A.(5)(c) Photographs sufficient to provide a' record <br />of foundation conditions and various stages of the construction <br />through completion; <br /> <br />9.A.(5)(d) All geologic information obtained; and <br /> <br />9.A.(5)(e) Construction problems and remedies. <br /> <br />9.A.(6) A construction progress report summarizing the <br />contents of 9.A.(5)(a), 9.A.(5)(b),' and 9,A.(5)(e) above, must be <br />submitted to the State Engineer every 30 days or more frequently if <br />directed by the State Engineer. A summary report of all the items in <br />Rule 9.A.(S) shall be submitted at the end of cosntruction. . <br /> <br />9.A.(7) The engineer shall give the State Engineer at least <br />five days advance notice of initial materials placement on the dam's <br />foundation, in the cutoff trench, and' on the outlet foundation (or any <br />appurtenance requested by the State Engineer in advance), to allow <br />observation by the State Engineer. <br /> <br />9.A.(8) When unforeseen site conditions or material <br />availability require that the construction work differ significantly <br />from the approved plans and specifications, a change. order, including <br />details, must be provided by the engineer to the State Engineer. No <br />change shall be executed until approved by the State Engineer. Major <br />changes must be submitted in writing with supporting documentation, <br />and approved in writing by the State Engiener. Minor changes may be <br />transmitted verbally by the engineer and approved by the State <br />Engineer verbally. <br /> <br />. <br /> <br />- 32 - <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.