My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00465
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00465
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:28:06 AM
Creation date
10/6/2006 12:08:20 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150083
Contractor Name
John Peroulis and Sons Partnership
Contract Type
Loan
Water District
44
County
Moffat
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />. . <br /> <br />. <br /> <br />9.B.(4) The engineer shall give the State Engineer at least <br />five days advance notice to allow inspection of the cutoff trench and <br />outlet. foundation; <br /> <br />9.B. (S) <br />Ru 1 e 9. A. (8) . <br /> <br />9. B. (6) <br />10 days advance <br />inspection. <br /> <br />9.B. (7) The engineer shall notify the State Engineer of the <br />completion of the construction in accordance with Rule 10. <br /> <br />Change orders shall be submitted in accordance with <br /> <br />The engineer shall give the State Engineer at least <br />written notice of the engineers final construction <br /> <br />. <br /> <br />9.C. For minor Class. II and Large, Intermediate and Small dams <br />rated as Class III, the owner shall provide an engineer experienced in <br />dam design and construction, who shall be responsible for the <br />following: <br /> <br />. <br /> <br />9.C.(1) Not less than 30 days prior to construction or as <br />soon as possible for dams whose construction season is affected by <br />freezi ng weather, theengi neer shall not i fy the State Engi neer in <br />writing of the date construction will begin, the name of the engineer <br />in charge of the project, and the name of the contractor; <br /> <br />9.C.(2) The engineer shall observe, or provide for the <br />observation by a technician the construction work on the dam, the <br />cutoff trench, and outlet works foundation to see that they are in <br />substantial accordance with the approved plans. The engineer shall <br />endeavor to guard against defects and deficiencies in the construction <br />of the dam, and shall disapprove or reject work failing to conform to <br />the approved plans and specifications; <br /> <br />9.C.(3) Periodic tests shall be taken and inspections made. <br />Periodic progress reports shall be submitted as requested by the State <br />Engineer. The engineer, shall compile a record of 'all tests con- <br />ducted, and any problems and remedies, for submittal to the State <br />Engineer at the end of construction; . <br /> <br />9.C. (4) Change orders shall be submitted in accordance with <br />Rule9.A.(8); <br /> <br />9.C.(S) The engineer shall give the State Engineer at least <br />10 days advance written notice of the project engineers final con- <br />struction inspection; and' <br /> <br />9.C.(6) The engineer shall notify the State Engineer of the <br />. completion of construction in accordance with Rule 10. <br /> <br />- 34 - <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.