My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00276
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00276
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:28 AM
Creation date
10/6/2006 12:05:25 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153697
Contractor Name
Norwood, Town of and Norwood Water Commission
Contract Type
Loan
Water District
60
County
San Miguel
Bill Number
FSL
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />) <br /> <br /> <br />.,..' <br /> <br />",- <br />.,~ <br />",;':;:~\ OJ <br />. " ~ <br /> <br />June 20, 1994 <br />Page 3 <br /> <br />description of physical assets owned by the Norwood <br />Water commission. <br /> <br />7", <br />4. Chap III ,Land; This chapter only applies to- <br />~() ~r-oJects whi '-nclude irrigation as a purpose, and <br />U ' ~ld not be included in this report. (We could use <br />" ~ for Analysis of Alternatives.~ ~~ <br /> <br />~ChaPter IV-= Water. This chapter will provide a <br />description of the municipal water requirements, water <br />supply available, a list of water rights, and <br />information on water quality. <br /> <br /> <br />, <br /> <br />) <br /> <br />6. <br /> <br />Chapter y = Plan of Development. In this section the <br />Preliminary Design of the proposed improvements will <br />be presented. We will show a layout of the proposed <br />reservoir site and design details. Since this is a <br />new reservoir, we will also present information on' <br />alternative sites that have been investigated (if not <br />done in Chapter III). <br /> <br />All information available on geological investigations <br />will be_included. (Aqditional backhoe pits are <br />needed.) Laboratory tests of the soils to verify the <br />structural stability Of the embankments are also <br />recommended; a narrative report from Lincoln-DeVore is <br />also suggested based on their test holes. <br /> <br />It would also be helptul to have Air Photos prepare a <br />contour map with contours of 1 to 2 ft. elevation to <br />assure more accuracy tor the preliminary design since <br />it will be needed lat~r for final design. (It may not <br />be need~d for preliminary design since the site is <br />relatively flat; we c~uld take some elevation'shots to <br />get an approximate id~a of the slope if funds are <br />limited.:.) <br /> <br />7. Chapter VI = Estimated Cost. Cost estimates for the <br />proje~t will be developed and will be included in this <br />chapter. Also included will be any engineering costs <br />for final design and ~esident engineering. <br /> <br />8. Chapter VII, Proiect Evaluation and Chapter VIII. <br />Financial Proqram. These two chapters will be <br />combined together and will summarize proposed <br />construction costs and the repayment schedule. <br />Included in the repayment schedule will be a summary <br />of the payments covering any other debts owed by the <br />Commission, operation and maintenance costs, and <br />contributions to Emergency Operating Fund. <br />
The URL can be used to link to this page
Your browser does not support the video tag.