Laserfiche WebLink
<br />e <br /> <br />o <br /> <br />The Una Reservoir built <br />A critical drought year either preceded by a dry year or <br />followed by another lOO-year drought. <br /> <br />o <br /> <br />The probability that these conditions would occur simultaneously in <br />the 1 ife of the project are remote. Therefore, it is concluded that <br />the project is not likely to face any constraints in regard to the <br />availability of water for storage. <br /> <br />Ie <br /> <br />le <br /> <br />3686-a/6 <br /> <br />II -18 <br />