My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00549
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00549
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2011 3:02:57 PM
Creation date
10/6/2006 12:01:14 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153618
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 87-15
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />II" <br />~~--'.. <br /> <br />___.~._,_____." . __~_.c.__c__.___w,,~__ <br /> <br />., <br />( ) <br /> <br />.-.- '--~~._.........~....................~~.;;.;.,.:._- <br /> <br />.) <br /> <br />,._..>.;..;;......;,...~~~ <br /> <br />recorded stream flows shall be made for a selected study period. The study <br />period for detennining yield shall be investigated and jointly agreed upon <br />following discussions between the City, CWCB, and MKE, but shall not be less <br />than 30 years. <br /> <br />Reservoir inflow shall be established for the longest period that can <br />reasonably be achieved to pennit an evaluation of annual average maximum and <br />minimum storage content that is not unduly influenced by the critically dry <br />period for recreational and fish and wildlife purposes. <br /> <br />~ <br /> <br />An anlysis of daily water production, maximum supply rate, peak consumption, <br />required fire flow, and minimum storage requirements shall lie made and <br />presented in tabular fonn. <br /> <br />A water utilization analysis operating the three reservoirs in combination <br />with each other and separately for each reservoir shall be made as part of the <br />study and presented in tabular fonn summarizing monthly surface water opera- <br />tion studies and showing how Project water supply shall be enhanced by per- <br />fonning the necessary rehabilitative work to make the reservoirs fully opera- <br />ti onal. <br /> <br />The feasibility of enlarging Peterson and Twin Lakes Reservoirs shall be <br />evaluated. <br /> <br />A chemical and physical analysis of the water developed from each Project <br />shall be perfonned. As the primary use of the water is for municipal and <br />industrial purposes, observations shall be made regarding taste, color, odor, <br />biocides and other parameters that might effect project facilities or service <br />and what types of treatment are required for human consumption. Any special <br />requirements for selective withdrat/al, fish screens, etc. shall be assessed <br />and be discussed. <br /> <br />An analysis of reservoir sedimentation shall be made at each reservoir, <br />diversion works and transport system. <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.