My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00540
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00540
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:24 AM
Creation date
10/6/2006 12:00:44 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153697
Contractor Name
Norwood, Town of and Norwood Water Commission
Contract Type
Loan
Water District
60
County
San Miguel
Bill Number
FSL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3. Restore the Old City Reservoir system. <br /> <br />4. Construct a dam in Ed-Joe Draw. <br /> <br />5. Install a pump station at the San Miguel River. <br /> <br />6. Purchase or drill new water wells. <br /> <br />Nonstructural Alternatives <br /> <br />7. <br /> <br />continue with existing methods and <br />with releases of water from Gurley <br />down Gurley Canyon during winter. <br />modification of by-laws. <br /> <br />facilities, <br />Reservoir <br />Requires <br /> <br />8. Verify minimum reliable supply from existing <br />water rights (other than Gurley) . <br /> <br />9. File on San Miguel River Water Rights. <br /> <br />10. Form association with irrigation companies in <br />area for multi-use reservoir. <br /> <br />11. Water conservation in winter. <br /> <br />V-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.