My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00529
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:15 AM
Creation date
10/5/2006 11:59:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153785
Contractor Name
Chipperfield Lane Ditch, Inc.
Contract Type
Loan
Water District
39
County
Garfield
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Implementation Schedule <br /> <br />The following schedule is proposed for implementation of the <br />project: <br /> <br />Task <br />1. Complete Final Design <br />2. NRCS Approves Design <br />3. Start Construction <br />4. Complete Construction <br />5. Project is Operational <br /> <br />Tarqet Comoletion Date <br />7/01/97 <br />7/15/97 <br />8/01/97 <br />9/15/97 <br />9/30/97 <br /> <br />Social, Economic, and Physical Impacts <br /> <br />The project will have no significant social impacts. <br /> <br />The project will have a positive economic impact by providing <br />additional irrigation water for 227 acres. Shareholders in the <br />CLDC will have enough water in low water years to adequately <br />irrigate their crops. <br /> <br />The project will have no significant physical impacts once <br />construction is complete. The pipelines will be below grade and <br />not visible, except for air vents and control structures. <br /> <br />Permitting <br /> <br />. <br /> <br />All easements and rights of way have been arranged for. The CLDC <br />has approval from the county to install the buried pipelines <br />under county road 326. The CLDC has approval from the Multa <br />Trina Ditch Company to construct a new headgate structure on the <br />ditch near the point it crosses county road 326. <br /> <br />Financial Plan <br /> <br />Total cost of the project is $80,000. $60,000 will come from a <br />loan with the Colorado Water Conservation Board, and the <br />remainder from the project sponsor, CLDC. There are no other <br />cost-share partners available to assist with the project's cost <br />at this time. Additional monies needed will be provided by the <br />project sponsor shareholders, on a pro-rate basis. <br /> <br />The CWCB Loan Application, the CWCB Memorandum of Loan Approval, <br />and the CWCB Approval Letter are found in Appendix E. <br /> <br />The CLDC is a new corporation and has no debts. <br /> <br />Feasibility Study <br />Chipperfield Lane Headgate and Pipeline <br />June 1997 <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.