My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00529
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:15 AM
Creation date
10/5/2006 11:59:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153785
Contractor Name
Chipperfield Lane Ditch, Inc.
Contract Type
Loan
Water District
39
County
Garfield
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The Selected Project <br /> <br />The main structure will take water from the North Lateral of the <br />Multa Trina Ditch. This inlet will be a single concrete <br />structure consisting of four headgates, four measuring devices, a <br />water cleaning device, and inlets to four pipelines. One line <br />will serve two different water users; the other three lines will <br />provide water to single water users. The inlet structure and the <br />first 1,200 feet of pipeline will cross one landowners' property. <br />All four pipelines will be laid in the same trench and will be <br />stopped at each individual landowners' property. There will be <br />approximately 10,500 feet of buried pipeline on this project laid <br />in approximately 4,000 feet of shared trenching. The proposed <br />project will have a capacity of 4 cfs, with an ability to supply <br />about 8 acre feet of water per day. <br /> <br />The NRCS Project Report and preliminary design are included in <br />Appendix B. <br /> <br />Water Rights <br /> <br />The 5 shareholders in the CLDC own a total of 1785 shares in the <br />Multa Trina Ditch, in which there are a total of 36,125 shares. <br />The Multa Trina diverted a total of 4782 acre feet in 1993, and <br />4340 acre feet in 1994, a~cording to State Engineer records. <br />Based on an average annual diversion of 4500 acre feet, CLDC <br />shareholders have a right to approximately 220 acre feet of water <br />per year. The articles of Incorporation and the Bylaws for the <br />Multa Trina Ditch are included in Appendix C. The S.E.O. <br />diversion records are found in Appendix D. <br /> <br />I <br />I <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $80,000, which includes a 20% <br />contingency. Project planning and engineering design will be <br />provided by the NRCS at no cost to the CLDC. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The cost of this project will be divided among the five <br />landowners (shareholders) involved, based on individual <br />water, pipe, structure, etc. <br /> <br />needs of <br /> <br />Feasibility Study <br />Chipperfield Lane Headgate and Pipeline <br />June 1997 <br /> <br />s <br />
The URL can be used to link to this page
Your browser does not support the video tag.