My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00529
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:15 AM
Creation date
10/5/2006 11:59:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153785
Contractor Name
Chipperfield Lane Ditch, Inc.
Contract Type
Loan
Water District
39
County
Garfield
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />A table showing cash flow for a $60,000 CWCB loan at 3.75% <br />interest over a 30-year repayment period is included in this <br />report. <br /> <br />Collateral <br /> <br />1. The CLDC can offer a collateral interest in assessments <br />collected from its shareholders to repay the debt, and the <br />project itself, if approved of the shareholders. <br /> <br />2. The CLDC can offer one payment in a certificate of deposit <br />account, to be held by the State Treasurer, if approved by vote <br />of the Board of Directors. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Feasibility Study <br />Chipperfield Lane Headgate and Pipeline <br />June 1997 <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.