My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00527
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00527
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:59:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0024X
Contractor Name
Florida Water Conservancy District
Contract Type
Loan
Water District
0
County
La Plata
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The plug will be removed by closing the outlet gates and <br />filling the outlet pipe. The plug can be lifted by air lift bags <br />and/or winches in the opposite manner of placement. The plug will <br />be lifted to the surface and the trash rack replaced. This must <br />be done expeditiously as the outlet cannot be closed for more than <br />one hour at a time. The plug will be stored in the dam super- <br />intendent's garage hopefully, not to be used again for many <br />decades. <br /> <br />The downstream control gates will be repaired after the <br /> <br /> <br />outlet is opened. The emergency gate above each control gate can <br /> <br />be closed to allow the work. The work can be performed when there <br /> <br /> <br />is snow because the gate chamber is the same temperature year <br /> <br /> <br />round. Reclamation must approve the use of only one set of gates <br /> <br />to release water if this arises. Generally, each set of gates is <br /> <br /> <br />opened equally. <br /> <br />The gates should be completely repaired by mid-December. <br /> <br />6.0-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.