My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00527
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00527
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:59:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0024X
Contractor Name
Florida Water Conservancy District
Contract Type
Loan
Water District
0
County
La Plata
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />at a time so as not to impact the river fishery below the dam}, 5} <br />lowering the plug into place with the plug valve open to pass <br />leakage flow 6) closing the plug valve, opening the air vent <br />valve and opening the gates to drain the outlet, 7} adjusting the <br />plug valve to obtain the desired release of about 9 cfs, and 8) <br />replacing the trash rack. <br /> <br />The outlet closing process is expected to take one day but <br />may take two if problems arise. The gate repair crew will begin <br />work the second day by first placing the bulkhead upstream of the <br />gate to be repaired first. To place the bulkhead, the plug valve <br />will be closed to totally dewater the outlet for about one hour. <br />The same contractor will probably be responsible for both the gate <br />repair and the installation of the turbine piping so the work on <br />the gates and piping should be more easily coordinated. <br /> <br />Once the first emergency gate is repaired the outlet will be <br />dewatered so that the bulkhead can be moved in front of the other <br />gate which can then be repaired. <br /> <br />When the two emergency gates are repaired and the turbine <br />piping has been modified (see next chapter for details) the gates <br />will be tested by closing them and filling the outlet pipe. The <br />outlet pipe upstream of the gates can be filled in one hour with <br />14 cfs through the plug valve. The outlet gates may have to be <br />opened for a few minutes each half hour to keep some flow in the <br />river below the dam. The gates and turbine piping can be checked <br />for leaks under normal pressure once the outlet is filled. If <br />problems arise, further work can be performed; if not the plug can <br />be removed as soon as the divers can be recalled. The divers will <br />not remain in Durango, so a few days notice would be required for <br />them to return. <br /> <br />6.0-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.